2025 Regal LX9
$258,900
Boat Details
Condition
Used
Location
Pensacola
Length
29 ft
Stock Number
214826
HORSEPower
400 hp
Engine Type
Outboard
Description
MarineMax Pensacola is thrilled to present the pre-owned 2025 Regal LX9 (Stock #214826), a sleek and exhilarating luxury crossover designed to deliver unparalleled performance and sophistication on the water. With a mere 36 engine hours, this 23-foot vessel is an exceptional opportunity for discerning boaters in the Pensacola area who desire a premium experience, whether cruising the bay, enjoying watersports, or entertaining on the beautiful Emerald Coast waterways.
The LX9 combines Regal's renowned craftsmanship with an innovative design that maximizes both space and style. Its crossover appeal offers the best of both worlds – the agile performance of a sport boat with the comfortable amenities of a larger cruiser. The low engine hours signify a meticulously maintained vessel, ready for its next adventure.
Key Features and Highlights:
- Powerful and Efficient Engine (Only 36 Hours!)
- Luxurious & Spacious Cockpit Layout
- Watersports Ready
- Integrated Swim Platform with SeaDek
- Premium Upholstery and Finishes
- User-Friendly Helm & Advanced Technology
- Ample Storage Throughout
- Premium Amenities: Enjoy a high-quality audio system, ambient LED lighting, and durable marine-grade materials, all contributing to a first-class boating experience.
This 2025 Regal LX9 (Stock #214826) offers a unique opportunity to own a nearly new, top-quality luxury crossover, perfectly equipped to deliver memorable moments and elevate your family's lifestyle on the water from MarineMax Pensacola.
Visit MarineMax Pensacola today at 1901 Cypress St, Pensacola, FL 32502, or call us at (850) 477-1112 to learn more and schedule your personal showing of this exceptional vessel!
Description
MarineMax Pensacola is thrilled to present the pre-owned 2025 Regal LX9 (Stock #214826), a sleek and exhilarating luxury crossover designed to deliver unparalleled performance and sophistication on the water. With a mere 36 engine hours, this 23-foot vessel is an exceptional opportunity for discerning boaters in the Pensacola area who desire a premium experience, whether cruising the bay, enjoying watersports, or entertaining on the beautiful Emerald Coast waterways.
The LX9 combines Regal's renowned craftsmanship with an innovative design that maximizes both space and style. Its crossover appeal offers the best of both worlds – the agile performance of a sport boat with the comfortable amenities of a larger cruiser. The low engine hours signify a meticulously maintained vessel, ready for its next adventure.
Key Features and Highlights:
- Powerful and Efficient Engine (Only 36 Hours!)
- Luxurious & Spacious Cockpit Layout
- Watersports Ready
- Integrated Swim Platform with SeaDek
- Premium Upholstery and Finishes
- User-Friendly Helm & Advanced Technology
- Ample Storage Throughout
- Premium Amenities: Enjoy a high-quality audio system, ambient LED lighting, and durable marine-grade materials, all contributing to a first-class boating experience.
This 2025 Regal LX9 (Stock #214826) offers a unique opportunity to own a nearly new, top-quality luxury crossover, perfectly equipped to deliver memorable moments and elevate your family's lifestyle on the water from MarineMax Pensacola.
Visit MarineMax Pensacola today at 1901 Cypress St, Pensacola, FL 32502, or call us at (850) 477-1112 to learn more and schedule your personal showing of this exceptional vessel!
Dimensions
Length nominal:
29 ft
Length overall:
29 ft
Weight
Displacement type:
Dry Load
Tanks
Fuel tank material:
Other
Black water tank material:
Other
Fresh water tank material: